Rudder Cable Linkage

Nothing too exciting tonight, completed the rudder cable linkage. I now have two control surfaces operable, the elevators and the rudder.

Advertisements

Aft Top Skin

Cheryl, Consti, and I installed the aft top skin. This is the skin that the rear window is glued to. We were then able to install the Garmin GTX23 ES transponder (thanks Carin!). We then also installed the rear dome/map light.